You will be advised of any hazardous areas due to the fallout of a nuclear explosive by a message with the code word __________.?
A) MERWARN B) NUCLEAR C) FALLOUT D) FALLWARN E)NULL
A) MERWARN B) NUCLEAR C) FALLOUT D) FALLWARN E)NULL
A) the base of the expansion trunk B) the base of the ullage port C) a line scribed within the ullage port D) an above-deck datum, usually the top of the ullage hole E)NULL
A) 1 month B) 12 months C) 24 months D) 36 months E)NULL
A) backing line B) towing line C) stern line D) breast line E)NULL
A) tension in the sling legs is less B) load can be lifted higher C) sling will be easier to attach D) sling will be easier to remove E)NULL
A) 2 months B) 1 month C) 2 weeks D) Before sailing E)NULL
A) provide safe electrical power connection to barge equipment B) keep the vessel from surging excessively C) prevent an accidental discharge of static electricity D) secure the cargo hose to a hatch when loading “overall E)NULL
A) Load Line Certificate B) Certificate of Inspection C) Admeasurer’s Certificate D) Forecastle Card E)NULL
A) American Bureau of Shipping B) Collector of Customs C) Treasury Department D) Coast Guard E)NULL
A) One B) Two, and three on rope diameters over 1 inch C) Three, and more on larger diameter wire ropes D) Four E)NULL